Cycle counts let us continuously verify that each hospital's on-hand pharmacy inventory matches what the PIMS (Cornerstone or Impromed) says we have — catching data-entry mistakes, miscounts, and shrinkage early, instead of waiting for a full annual inventory count to find out our numbers are wrong.

Context

Scope — pharmacy items only

This SOP covers what sells through the pharmacy: medications (tablets, capsules, oral liquids and suspensions, topicals, otics, ophthalmics), supplements and nutraceuticals, exotic support foods (Critical Care, Emeraid, Harrisons, KMR, Esbilac, Nutrical), behavior products, and ZenCollars.

Not included: injectables (except Vetsulin, which is counted at all three hospitals), white goods, and treatment supplies — including medical and avian collars, dental home care, syringes, and sharps containers. Those are counted under their own processes.

<aside> 🚫

Also excluded: prescription diets, which are counted weekly under their own SOP; and DEA-scheduled orals — tramadol, hydrocodone, oral buprenorphine — which are counted on the controlled log. Gabapentin stays in the cycle count: it is not federally scheduled, and it is the highest-volume pharmacy item we carry.

</aside>

The weekly count schedule

Each hospital's pharmacy items are ranked by units moved — not dollar sales. Units is what surfaces miscounts and shrinkage on the fast movers. That ranking sorts every item into four tiers. Tiers A, B and C are the weekly count — 20 items. Tier D is the slow tail and is swept once a year, not weekly.

That's 20 items per hospital per week (5 + 5 + 10). Count frequency scales with how often an item moves: Tier A weekly, Tier B monthly, Tier C quarterly, Tier D annually.

<aside> ⚠️

Why there is a Tier D. At 20 items a week, Tier A's 5 weekly repeats leave only 15 rotating slots — 195 counts a quarter. Lone Mountain has 310 items below Tier A, so counting all of them quarterly is arithmetically impossible at this weekly load; a full pass would take 21 weeks. The 50-unit cut solves it honestly: 126 items in Tier C is a genuine 13-week pass, and the 169 slowest items move to an annual sweep rather than a quarterly promise nobody can keep. The cut point is per hospital — set each one's Tier C at the top 130 items so 10 a week still closes in 13 weeks.

</aside>

PIMS differs by hospital

Aliante uses Cornerstone; Craig Road and Lone Mountain use Impromed. Looking up the current quantity on hand and correcting a count uses different steps in each system — both are covered in the Procedure below.